
ISO 9001:2015
Certified by BRE Global, accredited by UKAS
An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.
The same trade, measured against your building
A sprinkler system is designed against a hazard classification, not against a floor area. That classification comes from what the building is used for and what is kept in it, and it decides how much water the system must deliver, for how long, and what has to sit behind it. Below is what each kind of building carries, and the thing that most often goes wrong in it. Sentry Sprinkler Protection installs and services sprinkler systems in all of them.
Book a free survey or ring 07927 555475
Classifications are from Annex A of BS EN 12845, which is normative. Its tables are minimums, which is why each one reads "at least": a designer assigns the real class from the actual building, and storage on site routinely pushes it higher.
Nobody here can simply be asked to leave, so isolation is planned around the building rather than the other way round.
What is stored decides the class, and what is stored changes without anybody telling the sprinkler system.
Hundreds of people in one place at once, so evacuation is by the crowd. And a cinema carries the highest ordinary classification in the standard.
Two things surprise people here. A cinema sits at the top of the ordinary range, three groups above a hospital. And food production is not one answer at all: it spans three groups depending on what comes off the line.
| Building | Classification | Standard |
|---|---|---|
| Warehouses and distribution | OH1 to OH4, or High Hazard for storage | BS EN 12845 · LPC Rules |
| Blocks of flats | BS 9251, residential | BS 9251 · BS EN 12845 · BS 9990 |
| Care homes | BS 9251, residential | BS 9251 · BS EN 12845 |
| Schools and colleges | At least OH1 | DfE Technical Manual · BS EN 12845 · BS 9251 |
| Offices | Light Hazard, or at least OH1 | BS EN 12845 · BS 9990 |
| Museums and galleries | At least OH2 | BS EN 12845 |
| Cinemas and theatres | At least OH4 | BS EN 12845 |
| Hospitals and healthcare | At least OH1 | BS EN 12845 · HTM 05-02 |
| Cancer treatment centres | At least OH1, with specialist rooms | BS EN 12845 · HTM 05-02 |
| Food processing | OH1 to OH3, by product | BS EN 12845 · LPC Rules |
| Shopping centres | At least OH3 | BS EN 12845 · BS 9990 |
Not on the list? The classification tables are also used as guidance for occupancies they do not name, so a building type that is not here still resolves to one of these. Tell us what it is and we will tell you which.
ISO 9001, certified by BRE Global and accredited by UKAS. Somebody independent audits how every job is planned, recorded and signed off, on a schedule.

Certified by BRE Global, accredited by UKAS
An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.
Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.
Free survey · fixed price in writing
Four quick taps and your details. A free survey and a fixed price in writing, with no survey fee and no obligation.
Mon to Fri, 7am to 5pm. Emergencies any hour.
Request received
Step 1 of 5 is done. Here is how the rest goes.
No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.
Request received
Step 1 of 5 is done. Here is how the rest goes.
Hello. Tell us what the building needs and roughly where it is, and we will come back with a price and a date.
Sentry