Sprinkler systems for blocks of flats in Kettering

Sprinkler systems for blocks of flats to BS 9251, installed and serviced, with the dry or wet riser tested under BS 9990 alongside.

  • ISO 9001, the certification insurers look for
  • BS 9251 · BS EN 12845 · BS 9990
  • Free survey, fixed price in writing, no travel charge

What is different about blocks of flats

Sprinkler systems for blocks of flats usually come to us with a new block above 11 metres, a fire risk assessment that flagged the system, or a managing agent taking over a building with no records. Sentry Sprinkler Protection installs and services sprinkler systems for blocks of flats, to BS 9251, BS EN 12845 and BS 9990. Since 2020, Approved Document B has required sprinklers in new blocks of flats where the topmost storey is more than 11 metres above ground level. That threshold came down from 30 metres, and it is the single biggest change in UK sprinkler regulation this century. What it created is a large number of buildings with a system, and a much smaller number with a complete record for it.

  • Residential systems are their own standard

    BS 9251 covers residential and domestic sprinklers, and it is not BS EN 12845 with different heads. The design assumptions, the water supply and the maintenance regime are different, and a contractor who works to the commercial standard by habit will get it wrong.

  • The records belong to the building

    Commissioning documentation, as-fitted drawings and the maintenance log stay with the block, not with whoever last held the contract. Getting them handed over is the part worth insisting on, and it is where a change of managing agent most often loses the thread.

  • Access to flats is the practical problem

    Anything inside a dwelling needs the resident to let you in, which means notice, a schedule and usually two attempts. We plan the communal work and the in-flat work as separate visits so one does not hold up the other.

  • Risers and sprinklers are separate duties

    A block over 18 metres owes a dry riser under BS 9990 as well, on its own testing interval. They are frequently held by different contractors and fall out of step, which is the gap a fire risk assessor finds.

This work, on our sites

See the full gallery

From first call to certificate

Four steps, the same on every job.

  1. A sprinkler layout drawing marked up on site during a survey
    01

    Free survey

    We look at the building and its records, and tell you what it is due.

  2. A sprinkler installation drawing open on a laptop on site
    02

    Fixed price in writing

    Every item priced line by line. No survey fee, nothing added afterwards.

  3. An engineer installing sprinkler pipework from a scissor lift
    03

    The work, on your dates

    Isolation agreed before anyone arrives, kept as short as the job takes.

  4. A bank of sprinkler alarm valve sets with gauges in a plant room
    04

    Certificate and record

    A certificate and a photographed defect list, ready for your insurer.

  5. Start

    Book the free survey

    Tell us the building. We will tell you what it is due.

    Book a free survey

Free survey · fixed price in writing

Tell us what you need. We will tell you what it takes.

Four quick taps and your details. A free survey and a fixed price in writing, with no survey fee and no obligation.

Call 07927 555475

Mon to Fri, 7am to 5pm. Emergencies any hour.

What do you need?

Pick one. The next questions follow from it.

What kind of building is it?
How tall is the building?
What is happening?
Which part needs looking at?
Where is the project?
When is it due?
How soon do you need us?
Who do we ring back?

Usually the same working day. We never share your details.

No survey fee, no obligation. ISO 9001:2015 certified.

Blocks of flats: questions

Our block is just under 11 metres. Do we need sprinklers?

Not under Approved Document B as the building stands. That settles the question for today and very little else: a roof-level alteration, an added storey or a change of use can move a building across the threshold, and the requirement then applies to the work being done. The measurement is taken to the floor of the topmost storey rather than to the ridge, so it is worth knowing which side of it you are on by measurement rather than assumption.

We have taken over the block and there are no records at all. What now?

That is a normal starting point rather than an awkward one, and it is recoverable. A survey establishes what is actually installed and what condition it is in, and a set of as-installed drawings can be produced from the system as it stands. It costs something once, and every handover after that is straightforward.

Do residents have to let you into their flats?

For anything inside a dwelling, yes, and that is the part that needs planning rather than the engineering. We give notice, work to a schedule and expect to make a second visit for the flats nobody was in for. The communal areas are done separately so the whole programme does not stall on one door.

Who is legally responsible, the freeholder or the managing agent?

The responsible person under the Fire Safety Order is whoever controls the premises, which in practice is usually the freeholder, with the managing agent acting for them. The duty can be delegated as work but not as responsibility, which is why the certificate and the record matter as much as the visit.

The published documents behind this page

Every interval and threshold on this page comes from one of these. Links go to the publisher, not to a copy of the document.

British Standards are copyright documents and most are bought rather than read free. We hold the ones we work to. If you need to know what one of them says about your building, ask us rather than buying it.

A block of flats, in 3D

Sprinklers in every flat and a dry riser for the brigade. Start a fire on the top floor and watch both at work.

Illustration only. Not a design.

Loading the 3D model

Drag to turn it. Ctrl + scroll to zoom. Click any part to see what it is.

The building

New blocks above 11 metres need sprinklers. Above 18 metres, a fire main as well.

Fire protection
Riser

Watch it happen, one step at a time.

Click any part of the model, or any part in the list below, to see what it does and how often it is tested.

Your system

What it needs
  • Weekly tank level check, pump start test, alarm motor test, system checks
  • Quarterly flow switch and alarm test
  • Six-monthly riser inspection
  • Annual tank inspection and clean, pump performance test under flow, valve set strip, clean and rebuild, full service, riser pressure test at 12 bar, held for 15 minutes

Illustration only. This model shows how a fire sprinkler system works. It is not a design for any real building, and the layout, pipe sizes, head spacing, water supply and riser positions in it are not the ones your building would need. Every real system is designed for its building after a survey, to BS EN 12845, BS 9251 or BS 9990.

Open the 3D builder on its own page

Certified, and audited on a schedule.

ISO 9001, certified by BRE Global and accredited by UKAS. Somebody independent audits how every job is planned, recorded and signed off, on a schedule.

BRE Global Certification and UKAS Management Systems 0007

ISO 9001:2015

Certified by BRE Global, accredited by UKAS

An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.

Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.

5.0 on Google

3 reviews, and every one of them five stars.

  • Lewis W. Sprinkler installation, warehouse

    Had them install a full sprinkler system across one of our warehouses, and couldn't be happier. They were professional from start to finish and the on-site team were genuinely friendly to work with. […] Highly recommend if you would need your building or warehouse properly fire-protected.

    5 stars on Google

  • Mike C. Weekly maintenance, testing and repair

    Sentry Sprinkler Protection have recently taken over the weekly maintenance, testing and repair of the […] sprinkler equipment. They are providing a excellent service, good value and they are also very helpful when on site.

    5 stars on Google

  • Sam E. Sprinkler pipework installation

    Couldn't recommend [Sentry] enough. Their work ethic, consistent efficient install of the pipework and overall approach to a project should be something every sub-contractor strives to mirror. Marius is incredibly approachable and methodical in his work with laydown areas kept very neat and tidy and all work carried out in a safe manner.

    5 stars on Google

Tell us the building. We will tell you what it is due.

No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.

Based
37 Dickens Drive, Kettering, NN16 9EG
Covering
Kettering · Corby · Wellingborough · Northampton · Rushden · Daventry · Market Harborough · Bedford and England, from our base in Kettering
Office hours
Monday to Friday, 7am to 5pm. Emergency line any hour.

What do you need?
Type of building optional
Who do we come back to?

    If it is urgent, ring rather than write. We are on the phone Monday to Friday, 7am to 5pm, and outside those hours the same number reaches the emergency line.

    Or send it straight to us

    Or just ring 07927 555475 and talk it through. Mon to Fri, 7am to 5pm. Emergencies any hour.