Fire sprinkler system design and installation

A new build, a retrofit, a change of use, or racking that has outgrown its system.

BS EN 12845 and BS 9251

Design comes before pipework. The hazard classification of what you store, how high you stack it and how the building is used all decide the density the system has to deliver, and getting that wrong is expensive to discover later.

What the visit covers

  1. Hydraulic design and hazard classification
  2. Installation to BS EN 12845 for commercial and industrial, BS 9251 for residential
  3. Commissioning, testing and handover documentation
  4. System alterations, extensions and upgrades

Questions we get asked

What does a sprinkler installation involve?

Hydraulic design against the hazard classification, a water supply assessment, installation to BS EN 12845 for commercial and industrial or BS 9251 for residential, then commissioning, testing and handover documentation.

Do we legally need sprinklers?

It depends on the building. In England, new blocks of flats with a top storey above 11 metres need them. Warehouses, and buildings where insurers or a fire strategy require them, are a separate question. Tell us the building and we will tell you where you stand.

Our racking has changed. Does the system still cover it?

Possibly not. Raising storage height or changing what you store can move the hazard classification and leave the existing system under-designed. It is worth checking before your insurer does.

Can you extend an existing system?

Yes. Extensions, alterations and upgrades to a system already installed are a large part of what we do.

Approved, and audited on a schedule.

Two certifications, and the first one is the reason we could apply for the second. ISO 9001 is a precondition for LPCB approval, so this is a sequence rather than a collection.

BRE Global Certification and UKAS Management Systems 0007

ISO 9001:2015

Certified by BRE Global, accredited by UKAS

An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.

LPCB, Loss Prevention Certification Board

LPCB approved

Loss Prevention Certification Board

The approval UK insurers look for on sprinkler work. A system installed by an LPCB approved contractor counts as genuine risk mitigation on your policy; one installed by anybody else may not.

Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.

Tell us the building.
We will tell you what it is due.

No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.

Based
37 Dickens Drive, Kettering, NN16 9EG
Covering
Kettering · Corby · Wellingborough · Northampton · Rushden · Daventry · Market Harborough · Bedford and the Midlands and East Midlands
Office hours
Monday to Friday, 8am - 5pm. Emergency line 24 hours a day, 7 days a week.

If it is urgent, ring rather than write. The phone is answered around the clock.